0102030405
Sakolin Blue-Orange Waterproof PE Tarpaulin Roll | Quality Product from China Suppliers & Factory
Product Specifications
Our premium blue orange poly tarp is designed specifically for buyers in Southeast Asia. As a trusted PE/PP tarpaulin manufacturer, we offer customizable tarpaulin roll solutions that meet the rigorous demands of industrial applications.
Technical Specifications
| Parameter | Details |
|---|---|
| Product Name | Blue/Orange sack trapal |
| Material | High-density PE with PP reinforcement |
| Color | Blue and Orange dual-tone |
| Sizes | 8ft(2.44m) x ~100m/roll, 12ft(3.66m) x ~100m/roll |
| Roll Weight Options | 28kg, 32kg, 40kg, 50kg per roll, etc. |
| Water Resistance | 100% waterproof |
| Certification | ISO 9001, SGS, ISO14001, BSCI, REACH |
| Used For | Truck Cover, Car cover, Seat cover, Fishpond Cover, Construction |
Order Information
-
Lead Time: 30 days after the receipt of the 30% deposit.
-
Sample Policy: Free samples available (freight collect).
-
Payment Terms: T/T 30% deposit, 70% against B/L copy.
-
Video Verification: Request a factory production video via our YouTube channel: MILLION PE Tarpaulin.
Ready to secure your high-quality tarpaulin rolls?
Contact Our Export Team Today
Learn how to get an accurate quote: https://www.milliontarpaulin.com/news/how-to-get-a-clearer-tarpaulin-quote/
FAQ
What is the packaging method for the tarpaulin?
We offer standard roll packing for our Ready Made Tarp products.
What is the Minimum Order Quantity (MOQ)?
Our minimum order quantity for wholesale and bulk orders is 5 tons.
What are your standard payment terms?
We require a T/T 30% deposit, with the remaining 70% balance paid against the copy of the Bill of Lading (B/L).
How long is the delivery lead time?
The standard delivery time is 30 days following the receipt of your 30% deposit.
Can I request free samples before placing a bulk order?
Yes, we offer free samples, with freight charges to be collected upon delivery.
Million Tarpaulin - Your reliable source for the best tarpaulin solutions since 2006.


